- 13th floor concrete slab completed.
- 14th floor concrete slab pouring and forming ongoing.
- Structural vertical elements between 13th to 14th floors and 14th to 15th floors are ongoing.
- MEP works up to level 9 ongoing.
- Stairs handrails installation completed below ground floor levels.
- Curtain walls delivery completed for levels 2, 4, 5, 6, 7, and 8.
- Garbage chute installation ongoing below ground floor levels.










