- 9th floor slab concrete pouring completed.
- Verticals between 9th & 10th floor concrete pouring on going.
- 10th floor forming ongoing.
- HVAC & MEP activities on going.
- Block work activities below grade on going.
- Temporary/Permanent gas connection completed.