Concord SKY Project Construction Report-February 2026

  • Concrete pouring at level 26 is ongoing.
  • Vertical structural elements between level 25-26 and level 26-27 ongoing.
  • Curtain wall installation at levels 10, 11, 12, and 13 are ongoing.
  • Corridor and demising wall framing are ongoing on level 9.
  • Corridor and demising walls boarding ongoing at level 7.
  • Demising wall Insulation and drywall taping are ongoing at L4, 5 & 6.
  • Garbage chut installed up to L18. 
  • HVAC installation is ongoing from level B01 upwards.
  • Electrical wire pulling in progress at level 23.